Time 4 Minute Read

“Decommissioning” is the process of terminating oil and gas operations at offshore platforms. It includes dismantling and removal of platforms and related infrastructure to restore the ocean and seafloor to pre-lease conditions. As elaborated in a prior post, decommissioning may involve partial structure removal or toppling in place, including the creation of artificial reefs. The U.S. Department of Interior’s Bureau of Safety and Environmental Enforcement (BSEE) estimates that about 3,700 active oil and gas platforms are under its jurisdiction, 40 percent of which are over 25 years old and likely to require decommissioning soon.

Time 10 Minute Read

Since the first Gulf of Mexico rig was installed in 1947, over 12,000 offshore oil and gas platforms have been installed globally. A 2016 study forecasts 600 will require decommissioning by 2021 and 2,000 more by 2040 at a cost of US$210 billion. Many newer platforms are sited in deeper waters, facing higher decommissioning costs and complexity.

The 1958 UN Convention on the Continental Shelf and 1972 London Convention broadly prohibited ocean “dumping.” Subsequent frameworks recognize exceptions permitting in situ offshore structure decommissioning consistent with internationally recognized standards. The 1982 UN Convention on the Law of the Sea (UNCLOS), for example, requires member states adopt rules no less stringent than the London Protocol, amending the original Convention to allow deliberate placement of subsea structures in defined circumstances. Thus, in situ offshore platform decommissioning has been recognized as conforming with governing treaties and legal frameworks.

Search

Subscribe Arrow

Recent Posts

Categories

Tags

Authors

Archives

Jump to Page